Shipping and delivery

Getting a frame from New Zealand to your site

We welcome enquiries from throughout the Pacific. Freight availability, container requirements and delivery costs are confirmed individually for each destination and project.

Who does what

We manufacture, label and pack the frame. Our shipping handler and you coordinate freight, customs and delivery. Your local builder unloads, stores and assembles it.

Render of an open shipping container on an island wharf, packed with strapped and tagged steel frame bundlesRender · design intent
The sequence

Seven stages from factory to site

Framing leaves our factory as labelled bundles, packed to suit the container. We hand the frame to our own shipping handler and can put you in direct contact with them. Freight, customs and delivery are then coordinated between you and them.

The full nine-step process
  1. Project and destination confirmed
  2. Framing detailed and manufactured in New Zealand
  3. Components labelled, bundled and packed
  4. Container requirements assessed and freight options reviewed
  5. Frame handed to our shipping handler and shipped to the agreed port
  6. Customs, unloading and site delivery coordinated between you and the shipping handler
  7. Frames stored correctly until assembly

Three ways to handle freight

  1. Option 01

    We introduce you to our shipping handler

    Most projects work this way. We hand your labelled, flat-packed frame to our own third-party shipping handler and put you in direct contact with them. You and they coordinate the booking, sailing and delivery.

  2. Option 02

    You use your own shipping agent

    Already have a freight forwarder or a container coming? We pack to suit and hand over at the agreed point.

  3. Option 03

    We help where we can

    We stay available to answer questions alongside your shipping handler, but day-to-day freight coordination sits with you and them, which keeps us focused on manufacturing.

Container packing

Packed for the far end, not just the truck

How a container is packed decides how hard the first day on site is. Every bundle is labelled to the drawings, so the builder at the other end can find what they need without unpacking everything.

  • Every component labelled to match the erection drawings
  • Bundled and flat-packed for transport
  • Container requirements assessed for each shipment
  • Packed to suit the container and the unloading conditions at the far end
  • Commercial documentation supplied for the shipment
  • Storage instructions supplied with every shipment

Container count and packing approach depend on the size of the project, the destination and how the container will be unloaded. Both are confirmed with your quotation.

Bundle of galvanised steel wall framing strapped on a factory trestle with yellow job tags
Labelled light gauge steel framing components packed in a timber crate for shipping
Open container of steel framing lifted by a crane on a Pacific wharf
Steel framing bundles stacked on timber bearers on site, part-covered by a tarpaulin
Customs and duties

Handled at the destination

Import duties, taxes and customs clearance are the responsibility of the importer unless your quotation states otherwise. We supply the commercial documentation the shipment needs.

Storage on site

Keep it dry, keep it off the ground

Off the ground on bearers, covered but ventilated, clear of standing water, cement dust and salt spray. Storage instructions are supplied with every shipment.

How to store framing on site
FAQ

Shipping questions

Where are you building?

Tell us the island and nearest port, and roughly how big the project is. We will tell you what is realistic for freight and what we would need next.

Request a quoteAsk a question